主页
低分辨率图形
关于我们港口委员会财务贸易/商业环境社区联系我们我如何找到...
首页 > 关于我们 > 大船通行准备电子邮件故事打印友好格式

大船通行准备

大型航运公司投资长滩港
新闻图片世界第三大航运公司 CMA CGM 已于长滩港集装箱码头(码头 J)购买了一个标桩,这一决定将为港口额外增加 260 万只集装箱,并将在接下来的 5 年为港口带来约 7,000 万美元的收入。
(发布时间:2012 年 12 月 12 日)
(read more)
Being Big Ship Ready
新闻图片To understand what it means for the Port to be “big ship” ready, consider that a deep channel is only the beginning.How about having bollards strong enough to secure a 150,000-ton ship, cranes tall and long enough to reach the containers, and operational support to handle nearly double the capacity of your typical container ship?Port of Long Beach Chief Harbor Engineer Al Moro explains.
(发布时间:2012 年 10 月 31 日)
(read more)

The future is BIG


The Port of Long Beach is at the forefront of technology and efficiency.Thanks to our efforts, the next generation of cargo ships, twice the size of those that entered the global fleet only 15 years ago, are now calling at the Port of Long Beach.

Larger ships are more cost effective for ocean carriers and reduce impact on the environment by decreasing diesel consumption.

These massive vessels, some with capacity of 14,000 TEUs, can be up to four football fields long and are already outpacing the yet-to-be-completed Panama Canal expansion.

Long Beach is one of only a handful of ports in North America capable of welcoming these larger ships, thanks to these vital features:

  • Deep-Water Main Channel — one of the deepest on the continent at 76 feet
  • Deep-Water Terminals — water depths of 50 feet or more at five of the Port's six container terminals
  • Berths designed to handle vessels that can exceed 156,000 tons fully loaded
  • Cranes that can move containers stacked 180 feet high and 24 boxes wide

Giant steps

Tomorrow's success depends on big investments today.That's why the Port of Long Beach is spending $4.5 billion on capital improvements over the next decade, ensuring that we maintain our advantage over other ports and increasing our ability to receive the most efficient and environmentally sustainable ships.Projects include:

  • Middle Harbor, which will be able to accommodate the latest generation of container vessels with the most technologically advanced container-moving system in the country
  • The replacement for the Gerald Desmond Bridge will include higher clearance to allow larger ships to reach the Back Channel
  • Improvements to roadways and the Port's rail network, technology and security

For information on our "big ship ready" facilities, our rail infrastructure and our capital improvement projects, click the links below.


FACILITIES GUIDE RAIL GUIDE CAPITAL IMPROVEMENTS


关于我们港口委员会财务贸易/商业环境社区联系我们我如何找到...
 Civica 软件
Powered by Translations.com GlobalLink OneLink Software